Getting Started – Lavington Turf Farms
Banner image

Getting Started

  • We recommend 4-6” of topsoil
  • Rake all large rocks & debris, level soil and then pack firmly with a lawn roller
  • Apply 11-51-0 fertilizer provided by us (FREE WITH ALL TURF ORDERS)
  • Begin installation along the longest straight line, such as a driveway or sidewalk
  • Stagger the joints in each row in a brick-like fashion. Avoid any overlaps or gaps!
  • Roll with a lawn roller.
  • Water immediately. In hot weather, water while installing.
  • Keep turf moist for approximately 2 weeks until firmly rooted.
  • Be sure your turf has enough moisture to survive hot, dry or windy periods.
  • Begin mowing when turf roots are difficult to separate from the soil, mowing high the first time bringing it down to the desired height gradually.

Get A Quote

Contact us today to receive a free quote for your turf project!

Contact Us

Maintenance Information

Question Mark

How can I protect my investment?

Click Here
Copyright Lavington Turf Farms Ltd. 2019